SITE | CONTRACT | CONTRACT NAME | PROJECT DESCRIPTION | EMPLOYER/ |
# | NO | Â | CLIENT | |
F189 | 025/IPC/MoEST/JICS/W/2014-15/002/04 | LOT 5 –Construction of Zomba urban and Muhusuwa Community Day Secondary Scholls and Chimwalira Conventional Secondary School. | Construction of Administration blocks, Classroom blocks, Laboratory, Ablution blocks and Assembly Hall and associated External Works | Japan International Cooperation System (Jics) |
F188 | 025/IPC/MoEST/JICS/W/2014-15/002/04 | LOT 4 Construction of Umbwi CSS in Dedza District and Kabekere CDSS in Ntcheu District | Construction of Administration blocks, Classroom blocks, Laboratory, Ablution blocks and Assembly Hall and associated External Works | Japan International Cooperation System (Jics) |
F187 | 61U/REH/SR/ZAC/14 | Rehabilitation of Selected Road(s) in Zomba city | Pothole patching and resealing of selected roads, ripping and gravel base processing of other sections of selected roads | The Roads Authority |
F186 | 62U/REH/SR/BTC/14 | Rehabilitation of Selected Blantyre City Roads | Pothole patching and resealing of selected roads, ripping and gravel base processing of other sections of selected roads | The Roads Authority |
F185 | 3T/REH/SR/BT/14 | Reconditioning and Resealing of Shoulders at Mwanza Boma on M06 Road | Reconstruction of shoulders in gravel, construction of bus bays and road side drains | The Roads Authority |
F184 | 4T/REH/SR/BT/CZ/14 | Sectional Rehabilitation of Mugabe Highway (M4) | Ripping of damaged road sections and disposal of unsuitable material, importing and processing pavement layers with crusher run and laying and compacting hot asphalt | The Roads Authority |
F183 | 3T/REH/SR/BT/14 | Resealing of Selected Sections of Kameza Round About - HHI Road (Magalasi) (S137) | Ripping of damaged road sections and disposal of unsuitable material, importing and processing pavement layers with crusher run and laying and compacting hot asphalt | The Roads Authority |
F182 | Repair works to defects on the pavement along Chipembere Highway | Works involved excavating and disposal of unsuitable material, construction of pavement layers in gravel and laying of hot asphalt and compacting | Nippo Corporation | |
F181 | Proposed Office Block on Plot CC 600 | Construction of a single story office block and associated external works | Bakhresa Malawi Ltd | |
F180 | Constructuion of Proposed Cereal Storage Plant and Associated Civil Works | Construction of silo base foundations, cable trenches, and associated drainage works | Bakhresa Malawi Ltd | |
F179 | 5/19/6 | Emergency Repair Works to Chileka Airport Runway 10/28 | Pothole patching of the runway at Chileka International Airport | Government of Malawi – Dept. of Civil Aviation |
F178 | Chichiri Shopping Centre Carpark and Driveway Rehabilitation Works | Pothole patches with hot asphalt on driveway and car parks | Broll Malawi Blantyre | |
F177 | NWDP/UWSS/BWB/W/17 | Addition Storage to Blantyre Water Board Project (Sub Contractor to Offshore Infrastructure Limited) | Construction of Water Tanks at Chigumula, Chimwankhunda and Kameza sites in Blantyre District | Blantyre Water Board / Offshore Infrastructure Limited |
F176 | Construction of Coal Transshipment Terminal in Liwonde for CEAR | Construction of Coal Transshipment Terminal in Liwonde for CEAR | Central East African Railways | |
F175 | Construction of Slip Lane and Repositioning of Bus Bay on Masauko Chipembere Highway | Construction of Slip Lane and Repositioning of Bus Bay and all associated works | Total Malawi Limited | |
F174 | SRWB/W/01/02 | Upgrading of Zomba and Mangochi Water Supply Schemes – Mangochi Lot 2 | Construction of  Water Storage tanks and all associated concrete chambers/ manholes and interconnecting pipe works | Southern Region Water Board |
F173 | SRWB/W/01/02 | Upgrading of Zomba and Mangochi Water Supply Schemes Lot 1 | Construction of 4 No. Water Storage tanks and all associated concrete chambers/ manholes and interconnecting pipe works | Southern Region Water Board |
F172 | Rehabilitation of a Carkpark at Macsteel Offices in Limbe | Rehabilitation of Car park Area. Pothole patches and supply , lay, level and compact hot asphalt and roll to levels | Macsteel Limited | |
F171 | Construction, Completion, Maintenance of new Silos Foundation and associated works | Construction of Silos, Retaining Wall and External Works | Bakhresa Grain Milling (MW) Limited | |
F170 | 58/2010 | Construction of New National Pharmaceutical Warehouse for Central Medical Stores-Phase1 | Construction of Pharmaceutical Warehouse and Associated Works | Malawi Government Ministry of Health |
F169 | RA/W/5 | Low Volume Sealing, Gravelling, Reshaping and Associated Drainage works for selected roads along Mangochi-CapeMaclear Corridor | Upgrading, Rehabilitation and Maintenance of Selected Roads | The Roads Authority |
F168 | RA/W/3 | Low Volume Sealing, Gravelling, Reshaping and Associated Drainage works for selected roads along Zomba-Phalombe-Mulanje (Mulanje Slice) | Upgrading, Rehabilitation and Maintenance of Selected Roads | The Roads Authority |
F167 | 103U/REH/SR/ZAC/08 | Rehabilitation of Selected Roads in Zomba City (Lot 2) | Rehabilitation and Paving of existing Roads | The Roads Authority |
F166 | 102U/REH/SR/08 | Rehabilitation of Selected Paved Roads in Blantyre City (Limbe Area) | Rehabilitation and Paving of existing Roads | The Roads Authority |
F 165 | RA/DEV/08/05 | Upgrading of Mzimba –Eswazini-Kafukule-Ezondweni-Ekwendeni Road & the Ezondweni-Njakwa Spur Project – Mzimba-Eswazini-Mzarangwe Section | Upgrading of Gravel Road to Bitumen Standard – Class II | The Roads Authority |
F 164 | Proposed Sheds and Ancillary Works | Construction of Sheds, Canteen and Associated works | Safintra Steel Suppliers | |
F 163 | 7UD/RT/SR/BTC/08 | Retainer Pothole Patching within the City of Blantyre – Limbe Area | Pothole Patching within Limbe Area | The Roads Authority |
F 162 | 6UD/RT/SR/BTC/08 | Retainer Pothole Patching within the City of Blantyre - Chichiri Area | Pothole Patching within Chichiri Area | The Roads Authority |
F 161 | 5UD/RT/SR/BTC/08 | Retainer Pothole Patching within the City of Blantyre | Pothole Patching within Blantyre CBD | The Roads Authority |
F 160 | Construction of Warehouse Substructure | Construction of WarehousecPlatform and associated Drainage Works | Candlex Ltd | |
F 159 | Proposed Warehouse Platform | Construction of Slab for the Warehouse | Bakhresa Grain Milling Company | |
F 158 | RA/DEV/07/01 | Construction Mzimba – Ekwendeni Road | Upgrading of Gravel Road to Bitumen Standard – Class II | The Roads Authority |
F 157 | 21C/RTMC/SR/CZ/07 | Retainer Contract For Limbe-Namadzi (M3) and Limbe-Chiradzulu (S146) Roads | Shoulder repair,drains,culvert cleaning, road patching & general road maintenance | The Roads Authority |
F 156 | 34U/RTMC/SR/BTC/07 | Routine Pothole Patching of  Limbe Roads in Blantyre City | Drains, gravel road wearing course, crusher run base, road patching & general road maintenance | The Roads Authority |
F 155 | 33U/RTMC/SR/BTC/07 | Routine Pothole Patching of Chichiri Roads in Blantyre City | Drains, gravel road wearing course, crusher run base, road patching & general road maintenance | The Roads Authority |
F 154 | 32U/RTMC/SR/BTC/07 | Routine Pothole Patching of Roads in Blantyre City | Drains, gravel road wearing course, crusher run base, road patching & general road maintenance | The Roads Authority |
F 153 | Proposed Production Plant & Blow Moulding Factory At Makata | Access Road & Carpark Construction and 2No. Warehouse Foundation bases | Candlex Limited | |
F 152 | 3E/REH/SR/ ZAT/07 | Rehabilitation of University Office Roads in Zomba Municipality | Road rehabilitation, including inlet and outlet structures, and surfacing works. | The Roads Authority |
F151 | W/025/IPC/ESSUP/003 | Construction of New Liwonde TTC | Construction of a completely new Teachers’ Training Centre | Ministry of Education & Vocational Training |
F 150 | 1C/REH/ZA/MH/07 | Rehabilitation of Selected Roads in Mangochi | Road rehabilitation, inlet and outlet structures, overlay, chip sealing of selected roads | The Roads Authority |
F 149 | 3UD/RTMC/BT/BTC/07 | Routine Pothole Patching in Limbe | Pothole Patching | The Roads Authority |
F 148 | 7UD/REH/BT/BTC/07 | Rehabilitation of Ndirande-Malabada Road in Blantyre City | Road rehabilitation, side drains construction, Inlet and outlet structures and asphalt overlay  | The Roads Authority |
F 147 | 1UD/REH/BT/ BTC/07 | Road Rehabilitation Works – Chirimba Industrial Area Roads in Blantyre City | Road rehabilitation, trimming of shoulders, pothole patching and Asphalt overlay on all roads at Chirimba Industrial area | The Roads Authority |
F145 | Construction of Small earth dams in 8 districts | Construction of earthen dams,importing soils to form a dam across identified streams | Ministry of Irrigation & Water Development | |
F144 | 3UD/RTMC/BT/BTC/06 | Routine Term Maintenance Works in Blantyre City | Patching, Slurry Sealing, Drain construction and cleaning, road rehabilitation | National Roads Authority |
F143 | 1UD/ZA/ZA/05 | Construction of access roads and associated drainage works – Chapima Heights | Bush clearing, formation, embankment  subbase, base gravel, cape seal (singke with slurry) concrete culverts, box culverts, brickline drains, road furniture | Press Properties Limited |
 F142 | 1UD/ZA/ZA/05 | Upgrading of unpaved section of Kuchawe road | Road rehabilitation, inlet and outlet structures, embankments, cape seal using 19mm chippings, road marking | National Roads Authority |
F141 | Concrete Floor works at Manja Candlex Depot | Rehabilitation of the concrete floor inside a warehouse at Manja | Candlex Limited | |
F140 | NRA/005/02 | Rehabilitation of Churchill and mahatma Gandhi roads | Base recycling and resealing of the Mahatma Gandhi and Churchill roads | National Roads Authority |
F139 | Civil works at Portland Cement Company | Reinforced concrete flooring in the loading shelter ane associated drainage works | Ensamble Strut (Pty) Limited | |
F138 | Reinforced concrete carpark works | Rehabilitation of the reinforced concrete carpark at a warehouse at Manja | Candlex Limited | |
F137 | 1C/RT/BT/BT/TO/CZ/MN/03 | Retainer Pothole Patching - Central Roads Division | Pothole Patching in  Blantyre City | National Roads Authority |
F135 | 1UD/RT/BT/BTC/03 | Retainer Contract | Pothole Patching in Limbe Area of Blantyre City | National Roads Authority |
F134 | NRA/002/02 | Industrial Roads - Rehabilitation of Selected Urban roads in Blantyre/Limbe | Industrial Roads - Rehabilitation of Selected Urban roads in Blantyre/Limbe | National Roads Authority |
F133 | NRA/001/02 | Kenyatta Drive - Rehabilitation of Selected Urban roads in Blantyre/Limbe | Kenyatta Drive - Rehabilitation of Selected Urban roads in Blantyre/Limbe | National Roads Authority |
F132 | 2C/BT/TO/03 | Centre Line (white) and Edge line (Yellow) Marking of M2 and S150 in Thyolo District | Centre Line (white) and Edge line (Yellow) Marking of M2 and S150 in Thyolo District | National Roads Authority |
F131 | 2UD/BT/BTC/03 | Shoulder repair and Drainage works on Limbe - Nkolokoti Parkway Road in Blantyre City | Shoulder repair and Drainage works | National Roads Authority |
F130 | 1UD/BT/BTC/03 | Shoulder repair to Paved Roads, Side Drain Lining, Scarification, Pothole Patching, Chip Spreading, Slurry sealing, Masonry Construction in Naperi and Chitawira | Shoulder repair to Paved Roads, Side Drain Lining, Scarification, Pothole Patching, Chip Spreading, Slurry sealing, Masonry Construction | National Roads Authority |
F129 | Â | Rehabilitating Access Roads and Car Parks at Hillview Primary school | Roads and Car Park Rehabilitaion and Drainage works | Hillview Primary School |
F128 | 11CE/LL/NU/02 | Riviri Bridge Repair and Protection Works | Involves river training works, building embankments,embankment protection and resurfacing existing roads | National Roads Authority |
F127 | LOT NO. 3 | Road Works at Mwanza RDP Headquarters | Roadworks, carparks pavings stormwater drainage works | Ministry of Agriculture and Irrigation |
F126 | 5CE/ZA/MHG/01 | Erosion Protection Works at Liwonde Barrage | Protection of the south west and NW embankment protections | National Roads Authority |
F125 | CC/01/03 | Roads and Carpark Rehabilitation and Drainage | Rehabilitation of access roads and carpark and improvements on drainage works into Country Club Limbe | Country Club Limbe |
F124 | BDRP/CIVIL -02 (LOT B) | Blantyre Distribution, rehabilitation and Reinforcement Project | Construction of several transformer foundations, plinths and site buildings | ESCOM |
F123* | 19 / 2001 | Construction of the Nkotakota Hospital | Construction of a completely new District Hospital | Ministry of Health and Population |
F122 | 11CE/ZA/MH/02 | Mangochi - Monkey Bay road (M10) Road Patching and River Training Works | Involved patching, gravelling ripped sections and  river training | National Roads Authority |
F121 | 1UD/RT/BT/BTC/02 | Retainer Contract  -  Patching works | Involved patching, culvert cleaning, excation and disposal of excess material deposited on the roads | National Roads Authority |
F120 | BCA/R2/02/10 | Patching, road marking and kerb planting | Ivolved patching, road marking - car parking areas and center line. | Blantyre City Assembly |
F119 | BCA/R7/02/10 | Rehabilitation of roads in the City | Involved total rehabilitation of gravel roads to bituminous roads and all associated drainage works | Blantyre City Assembly |
F118 | 3C/LL/DZ/02 | Grading, Spot Gravelling and associated drainage works : Mua-Kapiri-Phanga (M10) | Ivolved grading and gravelling, earth protection works, road signs and associated drainage works | National Roads Authority |
F117 | Â | Access road to The NEW Thyolo hospital | Involved chipsealing works on an access road to the houses of the New Thyolo Hospital | S R Nicholas Limited |
F116 | DCS/2 | ESCOM Â Maone substation demolition works | Involved demolition works of an existing Escom substation building and eartworks | ESCOM |
F115 | 1UDE/BT/BTC/02 | Upgrading of Mikolongwe road | Involves construcion and upgrading of the Mikolongwe road thus chip sealing, overlay, patching and  slurry sealing. Construction of drains, lined culverts etc. | National Roads Authority |
F114. | LPO Â 1006133 | Cure Hospital Roadworks | Involved construction of bituminous carpark and access road to the Cure International Hospital | S R Nicholas Limited |
F113 | PO Â 09314 | Refurbishment of Zomba II Filling Station | Involved improvements at an existing filling station | Mobil Oil (Malawi) Ltd |
F112 |  | Refurbishment of Mangochi  Filling Station | Involved improvements at an existing filling station | Caltex Oil Malawi |
F111 | PO Â M Â 5432 | Foundations for Depots at Blantyre and Lilongwe | Involved the construction on concrete foundations and drainage works | Caltex Oil Malawi |
F110 | BCA/R2/02/07 | Emergency works on Mikolongwe road | Involved extension of width of Mikolongwe road by 3m on the entire legth | Bkantyre City Assembly |
F109 |  | Rehabilitation of Access road, carpark and  Tennis court | Involves construction of bituminous carpark, access road and rehabilitation of the tennis court in premix | St Andrews International PrimARY School |
F108 | BDRP/CIVIL -01 (LOT A) | Blantyre Distribution, rehabilitation and Reinforcement Project | Involves construction of concrete pavement, bituminous pavement, perimeter fences and general earthworks for Escom sub stations | ESCOM |
F107 | Â | Reinstatement of Road Cutting | Involves grading, and spot gravelling of the road inside Liwonde National Park | Telesuprecon Limited |
F106 | 25UD/ZA/MHG/01 | Spot Gravelling , Reshaping and Drainage Works | Involves grading, and spot gravelling of the road inside Liwonde National Park | National Roads Authority |
F105 | 22C/BT/TO/01                 &                               Addendum | Rehabilitation, Gravelling, Chip Sealing, Slurry sealing and associated drainage works | Construction of the Makwasa road involving  patching, Chip sealing and Slurry sealing | National Roads Authority |
F104 | PO  No. 08751 | Patching works for Zomba Lakeroad  Filling station | Painting of the canopy and reconstruction of the forecourt with premix | Mobil Oil (Malawi) Ltd |
F103 | IFB No. 005 Lot 3 | 1No. 320 Student Day Secondary School  at Chapananga in Chikwawa district | Construction of a completely new Secondary School | Ministry of Education Science and Technology |
F102 | IFB No. 005 Lot 5 | 1No. 320 Student Day Secondary School  at Malimba in Chiradzulu district | Construction of a completely new Secondary School | Ministry of Education Science and Technology |
F101 | 1UDR/BT/BTC/01 | Retainer Contract  -  Patching and drainage works | This contract involved patching, and drainage works | National Roads Authority |
F100 | 1UD/BT/BTC/01 | Road Manitenance of selected Blantyre District roads | This contract involved 12,070m2 double chip sealing, Â 44571m2 slurry sealing, 1017m2 shoulder repair, 16411m2 patching and gabion protection works. | National Roads Authority |
F99 | 2UD/ZA/ZAT/01 | Patching AND Slurry Sealing on St Marys and Chirunga roads in Zomba | This involved 6,778m2 patching, 14,738m2 slurry sealing, timber deck bridges, shoulder repair and drainage works | National Roads Authority |
F98 |  | New concrete works at Total Refuelling Point at Sucoma  in Nchalo | This involved 300m2 concrete forecourt and all associated works | Petrosev Mw Limited |
F97 | 3C & 4C/ZA/MH/01 | Patching, Shoulder repair,reconditioning and spot gravelling in Mangochi district | This contract involved 3,704m2 patching, 3,970m2 gravel wearing course, 7km shoulder reconditioning and 1419m3 of shoulder repair | National Roads Authority |
F96 |  | Construction of Zomba, Salima and  Ntcheu filling stations | Involved total construction of Zomba caltex filling staion, renovation works of salima and Ntcheu filling stations | Caltex Oil Malawi |
F95 | Small Scale Localy Funded Projects  - OPC | Boundary wall construction at  Blantyre secondary School | Involved construction of a 2.3km long boundary wall, gate house and 130m3 gabion protection works | Ministry of Education and  Culture |
F94 |  | Renovation of Access roads and Carpark  to st Andrews primary School | Involved total rehabilitation of staff/service access road, St Andrews close, School entrance and car park | St Andrews Primary  School |
F93 | Small Scale Localy Funded Projects  - OPC | Renovation of Wilberforce Hostel at Blantyre secondary School | Involved renovation of a fire damaged hostel | Ministry of Education and  Culture |
F92 | BCA/04/01 | Roadworks in preparation for SADC Summit | Involved patching, slurry sealing, construction of foot paths | Blantyre City Assembly |
F91 | 28/98 | Priority Resealing and Associated Works Contract 28/98 | Involved Chipsealing works, patching, Slurry  sealing works, crack sealing works and all new road hardware like signs etc | National Roads Authority |
F90 | CTB 4526/S/1 | Extenal works at New Ntcheu Secondary School | Involved roadworks, drainage works and sports fields construction | Malawi Government |
F89 |  | Rehabilitation of Limbe Service Station | Involved reconstruction of the forecourt in  premix and improvements to the existing kiosk, toilets and canopy | Mobil Oil (MW) Ltd |
F88 |  | Renovation Works on Glyn Jones & Chipembere  Highway Filling Stations | Involved renovation works of the Caltex filling Stations | Caltex Oil Malawi Ltd |
F87 | 3C/LL/NU/00 | Spot Gravelling & Associated Road works - Ntcheu | Involved spot gravelling and grading with  the associated drainage works | National Roads Authority |
F86 | 35/CE/BT/TO/NE/G-S/00 | Grading, Spot Gravelling, & Drainage Works Makwasa-Thekerani-Muona road | Involved heavy grading and gravelling and associated drainage works | National Roads Authority |
F85 | Â | Redevelopment of Haille Sellasie Filling Station | construction of a reinforced concrete forecourt and canopy | Oilcom Malawi Ltd |
F84 | Â | Construction of college cafeteria in Blantyre | Construction of a cafeteria consisting of kitchen, dining hall, kiosk and toilets | Malawi College of Accountancy |
F83 | BCA/02/ER3 | Rehabilitation of access road to Rab  Processors | Total construction of an access road to Rab Processors with all the drainage works | Blantyre City Assembly |
F81 | 77UD/BT/BTC/P/99 | Blantyre - Soche"A" (Ward 10)   Patching and drainage  works | Consituted paching  and associated drainage  works | Blantyre City Assembly |
F80 |  | Demolition and rehabilitation of  High way Filling station | Construction of a reinforced concrete forecourt and canopy | Oilcom Malawi Ltd |
F79 |  | Improvement of Total Filling Station  Lilongwe | Construction of a reinforced concrete forecourt and kiosk | Total Malawi Limited |
F78 | CTB 4621/P/5 | Construction of new Salima Primary  School | Consisting of Administration block, 8no. Double  classroom blocks, 2no. Teachers houses, 4no. Ablution blocks and sports fields | Malawi Government |
F77 | CTB 4621/P/4 | Construction of new Dedza Primary  School | Consisting of Administration block, 8no. Double  classroom blocks, 2no. Teachers houses, 4no. Ablution blocks and sports fields | Malawi Government |
F76 | CTB 4621/P/8 | Construction of new Ntchisi Primary School | Consisting od Administration block, 8no. Double  classroom blocks, 2no. Teachers houses, 4no. Ablution blocks and sports fields | Malawi Government |
F75 | 31 / 95 | Roadworks at Government Offices at  Capital Hill | Construction of  1km pre-mix surfaced road. | Ministry of Lands (Capital Hill - Lilongwe) |
F74 | 74UD/BT/BTC/P/99 | Blantyre – Ndirande  :  Patching, reshaping and drainage works | Constuituted patching and drainage works | Blantyre City Assembly |
F73 | 71UD/BT/BTC/P/99 | Blantyre city (Ward 1,4,7,&8) Â Â Patching, reshaping and drainage works | Constuituted patching and drainage works | Blantyre City Assembly |
F72 | Â | Ndirande and Chilomoni Health Centers access roads and external works | Construction of access roads to Ndirande and Chilomoni health centres including gabion protection works. | Circle Plumbing Ltd |
F71 | Â | Refurbishment to International Division - Â Blantyre Branch | Extension to the international division at CBM comprising offices, toilets using permanent formwork to the first floor | Commercial Bank of Malawi |
F70 |  | Constuction of Primary Schools  in Machinga at five Centres | Each School comprising 6 classroom blocks, administration block, staff houses and sports fields | Malawi Government |
F69 | Â | Construction of executive houses at Area 43 in Lilongwe | Construction of 2no executive houses in Area 43 in Lilongwe | Commercial Bank of Malawi |
F68 | Â | Rehabilitation of Lotus Motors Filling Station | Construction of a reinforced concrete forecourt canopy and rehabilitation of existing kiosk | Oilcom Malawi Ltd |
F67 |  | Rehabilitation of Roads and Bridges in Phalombe | Construction of several span bridges  as specified by Ministry of Works Standard Specifications | Ministry of Works |
F65 | Â | Chilomoni South Sites and service Scheme | Construction of chip sealing road, all drainage works, plot dividing and plot beaconing . | City of Blantyre |
F64 |  | Regravelling and grading of selected  Blantyre City roads | Involved gravelling and grading of several  selected Blantyre roads | City of Blantyre |
F62 |  | Construction of a Training Hostel at  Queen Elizabeth Central Hospital | Construction of 2 no. hostel blocks with dining and kitchen facilities | Ministry of Health |
F61 |  | Costoms Reform Programme -  Compound B - Blantyre Training School | Construction of a new double storrey building consisting offices, boardroom, training hall, staff houses and rehabilitation of existing hostels | Malawi Government  -  Department of Customs and Excice |
F60 |  | Customs Reform Programme - Compound D  -  Mwanza Boarder Post | Construction of a reinforced concrete carpark, premix access roads, slurry sealing and substructures for offices | Malawi Government  -  Department of Customs and Excice |
F58 |  | Walkers Ferry Pipeline  Duplication Phase II) | Construction of a 12km  600 to 700diameter  high pressure pipe with all associated concrete chambers | Blantyre Water Board |
F57 | Â | JICA Aquaculture Project Office Building in Domasi | Construction of an aquaculture facility building consisting of dry and wet laboratories, offices, workshop and stores | JICA |
F56 |  | Limbe, Thyolo, Muloza road pipeline rerouting | Involved reruoting of a Blantyre Water Board  pipeline | Blantyre Water Board |
F55 | Â | Machinga District Hospital access road | Grading and gravelling of the access road | Ministry of Worsk |
F54 | Â | Construction of dual carriageway double chip seal road | Involved chipsealing works on a dual carriege way in Mzuzu | City of Mzuzu |
F53 | Â | Construction of a community primary school in Phalombe | Construction of 8 classroom blocks, Admin block, 6 toilet blocks and 3 staff houses | Ministry of Education |
F52 | Â | Maintenance and improvement of City Junctions | Involevd construction of concrete roundabouts, bituminous surface and associated drainage works | City of Blantyre |
F51 |  | Magomero Community Development  College Rehabilitation | Construction of teachers houses, extension of classroom blocks, toilets and rehabilitation of toilet blocks | Ministry of Women Affairs |
F50 | Â | Various Emergency works | City of Blantyre | |
F49 | Â | MPTC Microtower Access Rpad - Ndirande | Malawi Post Office | |
F48 | Â | Auction Holding Marshalling Yard | Auction Holdings Limited | |
F47 | Â | Mwanza Loop Road | Ministry of Works | |
F46 | Â | Ndirande squatter loop road reconstruction | Blantyre City Assembly | |
F45 | Â | Ndirande squatter roadworks upgrade | Ministry of Works | |
F44 | Â | M P O - TV Relay Station Civil Works | Malawi Post office | |
F43* | Â | Nyambadwe Service Reservoir | Construction of 4500m3 capacity circular concrete reservoir with all associated pipework | Blantyre Water Board |
F42 | Â | Walkers Ferry pipeline duplication | Blantyre Water Board | |
F41 | Â | Construction of Nkolokoti Parkway and Chilomoni cape seal surface road | City of Blantyre | |
F40 | Â | Malindi road works | Ministry of Works | |
F39 |  | Emergency roadworks in Mangochi  6/94 | UNHCR/Ministry of Works | |
F38 | Â | Construction of 4.5km single chip seal bituminous road | Malawi Housing Corporation | |
F37 | Â | Construction of 8km double chip seal industrial road | Maone Park Limited | |
F36 | Â | Civil Works at Reserve Bank of Malawi in Blantyre | Terrastone Limited / Reserve Bank | |
F35 | Â | Emergency roadworks in Mangochi - Â Namwera | UNHCR/Ministry of Works | |
F34 | Â | Emergency roadworks in Nsanje - Bangula | UNHCR/Ministry of Works | |
F33 | Â | Constuction of 6.2km double chip seal road | MPICO | |
F32 | Â | City of Blantyre Refuse Tip | City of Blantyre | |
F31 |  | Emergency roadworks in Ntcheu  - 19/91a | UNHCR/Ministry of Works | |
F28 Â $ Â Â Â Â Â Â Â Â Â F30 | Â | Bangula emergency roadworks | UNHCR/Ministry of Works | |
F27 | Â | Mudi roadworks | City of Blantyre | |
F26 |  | Emergency roads and bridge works in  Phalomba | Ministry of Works | |
F25 | Â | Fargo Housing Project - BCA Hill | Fargo Limited | |
F24 |  | Construction of 3.5km double chip seal  road | Press Properties Limited | |
F23 | 21/91 | Nsanje Emergency roadworks | UNHCR/Ministry of Works | |
F22 | 19/91 | Ntcheu Emergency Roadworks | UNHCR/Ministry of Works | |
F21 | Â | Civil works for Burco House | Burco Electronics Systems | |
F20 |  | Construction of Mangochi Water Supply  Project | Ministry of Works | |
F19 | Â | Construction of 1km single chip seal bituminous road | Malawi Army | |
F18 |  | Emergency roadworks in Nsanje  - 16/90 | UNHCR/Ministry of Works | |
F17 | Â | St Mary's and Kazembe roadworks | S R Nicholas | |
F16 | Â | Chinyoga Housing Project Earthworks | S R Nicholas | |
F15 | Â | Domasi College Oxidation ponds | I D A | |
F14 | Â | Conforzi Dam Remedial Works | I Comforzi (T & T) Ltd | |
F13 | Â | Muona Irrigation Scheme | Ministry of Agriculture | |
F12 |  | Kachenzi Estate Surfacing | Kachenzi  Estate | |
F11 | Â | Zomba - IDA Education Project - Earthworks | I D A | |
F10 |  | Emergency roadworks in Chikwawa and  Nsanje | UNHCR/Ministry of Works | |
F9 |  | Microwave  Tower - Chikwawa / Kwininda | Marconi Communications | |
F8 |  | Construction of Mapanga Dam and  spillway | Sable Farming | |
F7 | Â | Wallace Dam & Spillway | R W J Â Wallace | |
F6 | Â | Karonga Flood control | T C P D | |
F5 | Â | Construction of 4.5km single chip seal bituminous road | Ministry of Works | |
F4 | Â | Construction of footbal field and stadium | Malawi Development Corporation | |
F3 | Â | Namin'gomba Dam and concrete spillway | Naming'omba Tae Estate | |
F2 | Â | Nchima Dam and spillway | Satemwa Tea Estate | |
F1 | Â | Zoa Dam and Spillway | Zoa Tea Estate | |
-- | Â | Earthworks to Boiler House | Lever Brothers | |
-- | Â | Satemwa Dam and concrete Spillway | Satemwa Tea Estate | |
-- | Â | Road works Janda to Luwawa | Fairclough Internartional |