Mach 30 #EngineerSpeak Hangout Oct 08, 2015
Discussion Topic: Sprint 3 Planning
Attending: J, Aaron, Chris, Jeremy
Start: 2210 Eastern
End: 2235 Eastern
Summary:
Kicked off Sprint 3, continuing the work to move MTK to the new analysis engine.
Minutes:
- <Pre-meeting discussion on if we have enough resources to run a sprint based on who attended the meeting>
- Chris - after reviewing the backlog, thinks that there are small enough items to do a sprint with who we have
- Aaron - doesn’t feel comfortable working in the code, but would be ok with working on the “busy work” (documentation work to sync the project wikis with content from meetings)
- ---
- J - time for one more sprint before the holidays; Sprint 3 starts tonight and runs until 2015-11-19
- Committing to Sprint 3
- J (reduced capacity)
- Aaron (reduced capacity)
- Chris
- CQ-02 - Fix polyline bug (Jeremy handling as an assist to the team)
- YVN-20 - Update Yavin project pages (wiki, minutes, etc) on ODE
- YNV-10 - Convert PressureVessel test process to unit tests
- MTK-11 - Update MTK project pages (wiki, minutes, etc) on ODE
- Did - n/a
- Will do - Update the MTK wiki pages that discuss architecture to reference IPython instead of Sage
- Blocks? - my time is very tight, so may not get all of this done in a week
- Did - n/a
- Will do - Look at YVN-10
- Blocks? - Needs info on test case resources from J
- Did - n/a
- Will do - YVN-20
- Blocks? - time