Phase 1 Coach Meeting (10/06/2015 1615-1630)
Current Phase Status (1615-1620)
Went over current phase objectives - design
Pointed out copied and updated version of design document
Code refactoring and dealing with the unmerged branch will be the focus of Phase 2
Doing peer evaluations separately instead of having a team meeting Friday
4-Up Chart (1750-1800)
Progress and Ongoing need to have a higher level of granularity than “All”