5th Hour: 7th Grade, 3rd Quarter, 2016-2017

**Extra Credit is emailed out each week - take advantage of each of these extra credit opportunities.  Once the opportunity expires, it is too late to get that extra credit.  Extra credit can only help you grade.

**You also have “PLUS POINTS” you could use to boost a score.  You have 2 sets of “PLUS POINTS”, be sure to use them.  Your “PLUS POINTS” expire each quarter - do not let them go to waste.

MONDAY

TUESDAY

WEDNESDAY

THURSDAY

FRIDAY

January 9

10

11

12

End of 2nd Quarter

End of 1st Semester

13

First day of 3rd Quarter

First day of 2nd Semester

Watch PBIS PSA Episodes of previous class.

January 16

No School, Teacher Inservice

17

No School, Ice Storm

18

“Race Against the Clock: Fun Facts (45 facts)”

Students type the 45 facts throughout the entire class period.

Students print (done or not done) at the end of the class period.

The number of facts typed is their score.

The facts are less than a full line of type - no facts are more than one line.

First 10-minutes with “keyboard skin” on the keyboard.

Practice your keyboard skills whenever you have a chance - this is a skill you will use for a long time.

19

“Race Against the Clock: Fun Facts (45 facts)”

Students type the 45 facts throughout the entire class period.

Students print (done or not done) at the end of the class period.

The number of facts typed is their score.

The facts are less than a full line of type - no facts are more than one line.

First 10-minutes with “keyboard skin” on the keyboard.

Practice your keyboard skills whenever you have a chance - this is a skill you will use for a long time.

20

“8 Keyboarding Races:  4 covered and 4 uncovered”

Students have the entire class period to complete a total of 8 Typing Races (from my website).

4 Typing Races must be completed with the keyboarding skin ON.  Students need to ‘snip’ the results of each race and copy-and-paste into WORD.

4 Typing Races will be completed with the keyboarding skin OFF.  Students need to ‘snip’ the results of each race and copy-and-paste into WORD.

Students should then find their average speed and average accuracy with the skin ON.

Students should then find their average speed and average accuracy with the skin OFF.

Print and turn in.

Practice your keyboard skills whenever you have a chance - this is a skill you will use for a long time.

January 23

“8 Keyboarding Races:  4 covered and 4 uncovered”

Students have the entire class period to complete a total of 8 Typing Races (from my website).

4 Typing Races must be completed with the keyboarding skin ON.  Students need to ‘snip’ the results of each race and copy-and-paste into WORD.

4 Typing Races will be completed with the keyboarding skin OFF.  Students need to ‘snip’ the results of each race and copy-and-paste into WORD.

Students should then find their average speed and average accuracy with the skin ON.

Students should then find their average speed and average accuracy with the skin OFF.

Print and turn in.

Practice your keyboard skills whenever you have a chance - this is a skill you will use for a long time.

24

Movie Maker introduction - pick up the notes from the front table - KEEP THESE NOTES (big packet of details)

Create Practice folder in class together in class

Go through the steps to making a movie - be thinking of a possible topic … project coming soon

25

No School, weather

26

Movie Maker introduction - pick up the notes from the front table - KEEP THESE NOTES (big packet of details)

Create Practice folder in class together in class

Go through the steps to making a movie - be thinking of a possible topic … project coming soon

27

Continue working through the Movie Maker program

Be sure to bring notes to class each day

You will need headphones or earbuds for the upcoming project.

January 30

31

February 1 - noon out

2

3

February 6

Finish off Movie Maker skills:

  • Text duration
  • Video duration
  • Credits

Go through Movie Maker project (blue packet)

Head-start workday

7

Finish off Movie Maker skills:

  • Text duration
  • Video duration
  • Credits

Go through Movie Maker project (blue packet)

Head-start workday

8

Movie Maker Project Quick Quiz… once you finish, begin working on project

Movie Maker workday 1 of 4

Keep your peach notes packet and your blue project packet out at all times for detailed directions

9

Movie Maker Project Quick Quiz… once you finish, begin working on project

Movie Maker workday 1 of 4

Keep your peach notes packet and your blue project packet out at all times for detailed directions

10

Movie Maker workday 2 of 4

Keep your peach notes packet and your blue project packet out at all times for detailed directions

February 13

No class - roller-skating

14 (black day)

Flip flop to red day for 5th hour

Movie Maker workday 2 of 4

Keep your peach notes packet and your blue project packet out at all times for detailed directions

15

Movie Maker workday 3 of 4

Keep your peach notes packet and your blue project packet out at all times for detailed directions

16 (midterm)

Movie Maker workday 3 of 4

Keep your peach notes packet and your blue project packet out at all times for detailed directions

17

No School - PD

February 20

Movie Maker workday 4 of 4

FINAL WORKDAY!!

Email Movie to Mrs. Driscol and to YOURSELF today!!

Keep your peach notes packet and your blue project packet out at all times for detailed directions

21

Movie Maker workday 4 of 4

FINAL WORKDAY!!

Email Movie to Mrs. Driscol and to YOURSELF today!!

Keep your peach notes packet and your blue project packet out at all times for detailed directions

22

PRESENTATION DAY!!

23

PRESENTATION DAY!!

24

Finish up any presentations we did not watch on Wednesday

Reflection questions due Tuesday boc - answer questions and print out

February 27

Finish up any presentations we did not watch on Thursday

Reflection questions due Wednesday boc - answer questions and print out

28

Reflection due

Keyboarding

March 1 - noon out

Reflection due

Keyboarding

2

Race Against the Clock

3

Race Against the Clock

March 6

Look at PowerPoint to Music examples - the importance of your topic… do not be random, be deliberate and purposeful

Go through how to calculate slides - use the formula!!

“Calculate Slides Page” due Wednesday BOC

7

Look at PowerPoint to Music examples - the importance of your topic… do not be random, be deliberate and purposeful

Go through how to calculate slides - use the formula!!

“Calculate Slides Page” due Thursday BOC

8

“Calculate Slides Page” due boc

Inserting audio, rehearse timings, project details

Topic Selection

Project Calendar

Head-start workday

9

“Calculate Slides Page” due boc

Inserting audio, rehearse timings, project details

Topic Selection

Project Calendar

Head-start workday

10

Workday 1 of 5

**ALL red day projects uploaded on Wednesday, March 22 at 3:03… completion score put in the gradebook for 3rd quarter.**

March 13

Workday 1 of 5

**ALL black day projects uploaded on Thursday, March 23 at 3:03… completion score put in the gradebook for 3rd quarter.**

14

Workday 2 of 5

**ALL red day projects uploaded on Wednesday, March 22 at 3:03… completion score put in the gradebook for 3rd quarter.**

15

Workday 2 of 5

**ALL black day projects uploaded on Thursday, March 23 at 3:03… completion score put in the gradebook for 3rd quarter.**

16

Workday 3 of 5

**ALL red day projects uploaded on Wednesday, March 22 at 3:03… completion score put in the gradebook for 3rd quarter.**

17

Workday 3 of 5

**ALL black day projects uploaded on Thursday, March 23 at 3:03… completion score put in the gradebook for 3rd quarter.**

March 20

Workday 4 of 5

**ALL red day projects uploaded on Wednesday, March 22 at 3:03… completion score put in the gradebook for 3rd quarter.**

21

Workday 4 of 5

**ALL black day projects uploaded on Thursday, March 23 at 3:03… completion score put in the gradebook for 3rd quarter.**

22 - End of 3rd Quarter

***Workday 5 of 5***

**ALL red day projects uploaded TODAY at 3:03… completion score put in the gradebook for 3rd quarter.**

23 - 4th Quarter begins…

***Workday 5 of 5***

**ALL black day projects uploaded TODAY at 3:03… completion score put in the gradebook for 3rd quarter.**

24