Phase 1 Initial Meeting (10/02/2015 1200-1315)
Note: Christopher Enoch was not in attendance at this meeting due to prior commitments.
Update Activity Tracker (1200-1210)
Phase 1 Planning (1210-1220)
- How are we going to split up work (layer or feature)
- Going to do it by feature
- Chris is going to build the branch that had a lot of work, to see if that work will impact us too much
- If the branch is usable, we will take a look at partially finished features and try to complete them
- If not, then we will look at the current architecture
- We have to read up on the design document and compare to the current system
- Look into how we can refactor the system if needed