rebrand.ly/a1bid
 Share
The version of the browser you are using is no longer supported. Please upgrade to a supported browser.Dismiss

 
$
%
123
 
 
 
 
 
 
 
 
 
ABCDEFGHIJKLMNOPQRSTUVWXYZ
1
2
DATE:
4/2/2018
3
4
5
CSLB# 917518
6
BID#0
8
3727 Pershing Ave San Diego, CA 92104
TOTAL:
$12,714
9
10
DESCRIPTIONHOURSLABOR
MATERIAL
12
1Travel/Store trip time$0$0
13
2BID TO INSTALL STONE TO THE BACK OF BUILDING.
$0
14
3set up and tear down scaffold. Equipment fee included.17.00$663
15
4Demo: remove stucco surface and haul away dump fee included34.00$1,326
16
5Labor -170.00$6,630
17
6
Basic labor estimate to install natural stone veneer. Apply building paper and metal lathe. Apply mortar scratch coat. Set stone in
$0
18
7
mortar and mortar joints. Includes planning, equipment and material acquisition, area preparation and protection, setup and clean up.
$0
19
8$0
20
9Materials105.00$4,095
21
10
Non-discounted retail pricing for: Irregular shape, natural cleft texture. Quantity includes typical waste overage, material for repair and local delivery.
$0
22
11$0
23
12Materials$0
24
13Natural Stone Veneer Materials and Supplies$0
25
14
Cost of related materials and supplies typically required to install natural stone veneer including: cutting and grinding materials,
$0
26
15mortar and reinforcement.$0
27
16$0
28
17$0
30
BID VALID FOR 90 DAYS: TOTAL326.00$12,714$0
31
Warranty information at a1warranty.sdcpm.com
32
TEL/FAX(888) 742-5215 : email ajpropsd@gmail.com .If approved payment will be required within 30days after which at 1.5% per month(not to exceed
any legal maxiumum, as well as any attorney's fee to enforce, collect, or interpret this agreement
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
Loading...