A | B | C | D | |
---|---|---|---|---|
1 | Task | Time Taken | Comments | Date |
2 | Design Meeting w/ Marcin (phone) | 1 hr | discuss contract and design intents | 8/1/2013 |
3 | Research Prefab Panels | 1 | see comments in log on roof module - basically, we're charting new territory | 8/5/2013 |
4 | 3d models of roof module | 2.5 | next steps: create version for pitched roof - insulate only above building volume | 8/6/2013 |
5 | Climate Analysis and Initial Passive Solar Calcs | 1.25 | download and review climate consultant data for area - determine ballpark for solar glazing | 8/6/2013 |
6 | Concept model | 2 | create first pass at concept for two modules separated by outdoor space | 8/6/2013 |
7 | Design Meeting w/ Marcin (phone) | 1 | discuss initial design steps - create plan for next steps | 8/7/2013 |
8 | Foundation Details | 2 | model foundation details in sketchup | 8/12/2013 |
9 | Design conversation w/ Brett Walsh re: constructability | 1 | discussion with professional builder Brett Walsh about foundation formwork, phasing of roof and prefab wall modules, and details for roof edging with modular idea | 8/12/2013 |
10 | Window/Door Components | 3 | design and model window/door components in sketchup | 8/14/2013 |
11 | Window/Door Instructions | 4 | create window and door instructions using sketchup and in design | 8/17/2013 |
12 | Conversation w/ Marcin | 1.5 | discuss foundation details, window modules, and next design steps | 8/15/2013 |
13 | Initial Materials List | 1.5 | generate the beginning of our materials list | 8/18/2013 |
14 | Conversation w/ Ryan Zaricki, solar engineer | 1 | planning for future thermal hyrdonic connection to another microhouse module | 8/25/2013 |
15 | Source specific components at Menards | 1.25 | sourced and photographed many of the small connectors and components for the utility module | 9/6/2013 |
16 | Marketing at BSU in Muncie | 8.5 | spent all day pitching Microhouse idea to students, administrators, and staff. Arranged interview with Dr. George Elvin for his upcoming book on post-petroleum architecture. also scheduled presentation on microhouse at the upcoming alumni symposium | 9/7/2013 |
17 | Model Interior Modules | 2.75 | create more detailed utility module and create loft and door partition modules | |
18 | Design discussion w/ Brett Walsh re: constructability | 2 | conversation w/ local professional builder Brett Walsh about constructability of certain components of Microhouse | 9/10/2013 |
19 | Graywater/Blackwater system design | 0.5 | conversation w/ permaculture designers Peter Bane and Keith Johnson re: blackwater and graywater system design | 9/12/2013 |
20 | Utility Module Design | 3 | Initial design of Utility Module | 9/13/2013 |
21 | Marketing at BSU in Muncie | 5.5 | presentation to 12 students about Microhouse build - one on one pitches to more than two dozen students - conversations with multiple professors | 9/20/2013 |
22 | upstairs module design | 2 | create and model upstairs wall modules | 9/20/2013 |
23 | design conversation w/ Walter Grondzik, PE | 1.5 | discussion with professional engineer regarding passive solar design, building sensoring, and construction details of microhouse | 9/20/2013 |
24 | exploded diagrams, plywood layout, detailed materials lists | 8 | create sketchup model to be used for sketchup assembly animation and exploded diagram - model plywood layout for maximum efficiency of material use - create materials lists by module | 9/21/2013 |
25 | menard's visit to source final components | 2 | finish sourcing specific components at menard's - gather SKU numbers | 9/24/2013 |
26 | finalize materials list and double-check | 3 | make certain that all bases are covered for materials | 9/24/2013 |
27 | phone call with Menards' | 1.5 | make last-minute substitutions with menard's for materials that were damaged or out of stock | 9/25/2013 |
28 | buy paint | 0.5 | pick up paint before leaving bloomington | 9/25/2013 |
29 | instructions | 6 | create instructions for module assembly, including layouts for bottom plates and axon drawings | 9/25/2013 |
30 | instructions | 2.5 | finalize instructions for build - double-check dimensions and workflow | 9/26/2013 |
31 | buy materials | 1 | purchase small materials from menard's that were not available for delivery from St. Joe menards' | 9/26/2013 |
32 | ||||
33 | total hours of design/planning | 73.25 | ||
34 | ||||
35 | on-site days for build | 6.5 | ||
36 | ||||
37 | ||||
38 | Other Consultants | |||
39 | Brett Walsh | 3 | ($30/hr) | $90 |
40 | Peter Bane and Keith Johnson | 0.5 | ($100/hr Peter, $75/hr Keith) | 87.5 |
41 | Ryan Zaricki | 1 | ($40/hr) | 40 |
42 | ||||
43 | 531 miles from Factor e Farm to 9545 E Baby Creek Road | |||
44 | ||||
45 | ||||
46 | ||||
47 | ||||
48 | ||||
49 | ||||
50 | ||||
51 | ||||
52 | ||||
53 | ||||
54 | ||||
55 | ||||
56 | ||||
57 | ||||
58 | ||||
59 | ||||
60 | ||||
61 | ||||
62 | ||||
63 | ||||
64 | ||||
65 | ||||
66 | ||||
67 | ||||
68 |