ABCD
1
TaskTime TakenCommentsDate
2
Design Meeting w/ Marcin (phone)1 hrdiscuss contract and design intents8/1/2013
3
Research Prefab Panels1see comments in log on roof module - basically, we're charting new territory8/5/2013
4
3d models of roof module2.5next steps: create version for pitched roof - insulate only above building volume8/6/2013
5
Climate Analysis and Initial Passive Solar Calcs1.25download and review climate consultant data for area - determine ballpark for solar glazing8/6/2013
6
Concept model2create first pass at concept for two modules separated by outdoor space8/6/2013
7
Design Meeting w/ Marcin (phone)1discuss initial design steps - create plan for next steps8/7/2013
8
Foundation Details2model foundation details in sketchup8/12/2013
9
Design conversation w/ Brett Walsh re: constructability1discussion with professional builder Brett Walsh about foundation formwork, phasing of roof and prefab wall modules, and details for roof edging with modular idea8/12/2013
10
Window/Door Components3design and model window/door components in sketchup8/14/2013
11
Window/Door Instructions4create window and door instructions using sketchup and in design8/17/2013
12
Conversation w/ Marcin1.5discuss foundation details, window modules, and next design steps8/15/2013
13
Initial Materials List1.5generate the beginning of our materials list8/18/2013
14
Conversation w/ Ryan Zaricki, solar engineer1planning for future thermal hyrdonic connection to another microhouse module8/25/2013
15
Source specific components at Menards1.25sourced and photographed many of the small connectors and components for the utility module9/6/2013
16
Marketing at BSU in Muncie8.5spent all day pitching Microhouse idea to students, administrators, and staff. Arranged interview with Dr. George Elvin for his upcoming book on post-petroleum architecture. also scheduled presentation on microhouse at the upcoming alumni symposium9/7/2013
17
Model Interior Modules2.75create more detailed utility module and create loft and door partition modules
18
Design discussion w/ Brett Walsh re: constructability2conversation w/ local professional builder Brett Walsh about constructability of certain components of Microhouse9/10/2013
19
Graywater/Blackwater system design0.5conversation w/ permaculture designers Peter Bane and Keith Johnson re: blackwater and graywater system design9/12/2013
20
Utility Module Design3Initial design of Utility Module9/13/2013
21
Marketing at BSU in Muncie5.5presentation to 12 students about Microhouse build - one on one pitches to more than two dozen students - conversations with multiple professors9/20/2013
22
upstairs module design2create and model upstairs wall modules9/20/2013
23
design conversation w/ Walter Grondzik, PE1.5discussion with professional engineer regarding passive solar design, building sensoring, and construction details of microhouse9/20/2013
24
exploded diagrams, plywood layout, detailed materials lists8create sketchup model to be used for sketchup assembly animation and exploded diagram - model plywood layout for maximum efficiency of material use - create materials lists by module9/21/2013
25
menard's visit to source final components2finish sourcing specific components at menard's - gather SKU numbers9/24/2013
26
finalize materials list and double-check3make certain that all bases are covered for materials9/24/2013
27
phone call with Menards'1.5make last-minute substitutions with menard's for materials that were damaged or out of stock9/25/2013
28
buy paint0.5pick up paint before leaving bloomington9/25/2013
29
instructions6create instructions for module assembly, including layouts for bottom plates and axon drawings9/25/2013
30
instructions2.5finalize instructions for build - double-check dimensions and workflow9/26/2013
31
buy materials1purchase small materials from menard's that were not available for delivery from St. Joe menards'9/26/2013
32
33
total hours of design/planning73.25
34
35
on-site days for build6.5
36
37
38
Other Consultants
39
Brett Walsh3($30/hr)$90
40
Peter Bane and Keith Johnson0.5($100/hr Peter, $75/hr Keith)87.5
41
Ryan Zaricki1($40/hr)40
42
43
531 miles from Factor e Farm to 9545 E Baby Creek Road
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68