ABCDEFGHIJKLMNOPQRSTU
1
9/19/2013
2
APAC Contruction
3
http://www.apac-ksmo.com/
4
1-816-632-2319
5
6
Gravel plus delivery (tax is additional)
7
$19.74$355.329/20/2013
8
$15.54$559.449/19/2013
9
Total (without tax cost)$914.76
10
9/18/2013
11
APAC Contruction
12
http://www.apac-ksmo.com/
13
1-816-632-2319
14
15
Gravel plus delivery (tax is additional)
16
$19.74$355.32
17
$15.54$839.16
18
Total (without tax cost)$1,194.48
19
20
9/17/2013
21
Road Parameters
22
LayersRock size (inch)Depth (inch)Cubic feetCubic yardsApproximate Tons (see note)Cost per tonApproximate cost
23
Base Layer264,650.00172.22232.5$15$3,488
24
Top Layer12.51,937.5071.7696.875$15$1,453
25
26
Base LayerAreasLengthWidthCubic feetCubic yards
27
Junk Yard Parking303045016.67
28
Workshop Parking7060210077.78
29
Drive behind workshop22010110040.74
30
Drive from SW Willow Rd20010100037.04
31
Total4,650.00172.22
32
33
Top LayerAreasLengthWidthCubic feetCubic yards
34
Junk Yard Parking30301886.94
35
Workshop Parking706087532.41
36
Drive behind workshop2201045816.98
37
Drive from SW Willow Rd2001041715.43
38
Total1,937.5071.76
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100