#ItemDetailsComplianceNotes
7
BASELINE
8
UP112-36 mos utility dataNo periods of major renovation.
9
UP2Utility baseline period
10
UP3Weather data - corresponding to baseline
11
UP412 mos occupancy data - corresponding to baseline
12
UP5Building asset dataReview (spot check) collected data.
13
UP6Baseline operational/performance dataReview operational and performance data (spot measurements, short-term monitoring, functional performance tests) analysis results.
14
UP7Normalized / regression-based baselineR-squared > 0.75. CV < 0.2
15
UP8End-use energy use estimates
16
UP9Utility rate structure
17
If Demand Charges or TOU in Effect
18
UP10Annual load profile
19
UP11Average daily load profiles
20
UP12Peak usage
21
UP13TOU summary by month
22
23
SAVINGS CALCULATIONS
24
UP14Energy modeling software
25
UP15Modeler credentials
26
UP16Weather file
27
UP17Model input filesReview modeling inputs. Check utility rate schedule.
28
UP18Model output filesReview model errors or warnings. Compare metrics to typical comparable metrics (such as EUI, ventilation rates, load densities, etc)
29
UP19Model calibrationCheck reasonableness of calibration methods. Calibration results should result in a NMBE of 5% and a CV(RMSE) of 15% relative to monthly calibration data.
30
UP20Model process description
31
UP21Model key metric benchmarks
32
33
ECMs
34
UP22ECM descriptions
35
UP23ECM model variablesCheck ECM modeling parameters and programming logic, as well as assumptions used, to ensure that they are conservative and documented.
36
UP24ECM results, and package resultsEnsure that savings estimates are reasonable, as compared to baseline and end-use energy consumption, previous project results, or simple estimation methods. Interactive effects.
37
UP25ECM ReportTypically part of the main EE report.
38
UP26Cost estimatesCheck that a construction feasibility review was performed and that all subsequent cost estimate components have been accounted for and accurately reflect the scope of work involved with the proposed ECMs.
39
UP27Investment criteria
40
UP28Quality assurance statement
41
UP29EE Report
42
43
DESIGN, CONSTRUCTION AND VERIFICATION
44
UP30OPV authority credentials
45
UP31OPV planReview OPV plan to ensure that it describes the OPV activities, target energy budgets and key performance indicators associated with the project and the individual ECMs.
46
PP32OPV statements
47
PP33OPV effort and reportReview OPV effort results and issues log, and ensure that appropriate actions are being taken to resolve issues or revise savings estimates.
48
PP34TrainingReview training plan to ensure that key items have been addressed. Consider interviewing FM.
49
PP35Systems manualASHRAE Guideline 1.4P. Ensure that the Systems Manual contains details regarding ongoing optimization of the systems, and a clear process and responsibility matrix for addressing issues.
50
51
OPERATIONS, MAINTENANCE AND MONITORING
52
UP36Ongoing management regime descriptionEnsure that the ongoing management regime selected is appropriate given the scope of the EE project, complexity of systems, and the skill level of the facility staff.
53
UP37Monitoring points listIf appropriate.
54
PP38Training on OM&M procedures
55
PP39Plan for remediation of issues
56
PP40OM&M Plan, maintenance plans and service response logEnsure that it meets the needs of the facility staff responsible for the energy-efficient operation of the new systems and equipment.
57
58
MEASUREMENT AND VERIFICATION
59
UP41M&V agent credentials
60
UP42M&V planChapter 5 of the IPMVP, Volume I-2012
61
UP43Routine adjustments
62
UP44Utility rates
63
PP45Non-routine adjustmentsShould be conservatively applied.
64
PP46Methods to handle routine/non-routine adjustments
65
PP47Energy data (12 months)Ensure that appropriate measurement periods that will reflect equipment operation through its full operating cycle have been selected (for both the baseline and reporting periods).
66
PP48Hourly ambient data
67
PP49Regression-based energy modelR-squared > 0.75. CV < 0.2
68
PP50UncertaintyOptional.
69
PP51M&V Report
70
71
UP52Engineering Certification (PE or CEM)
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
Loading...
 
 
 
Doc Tracker-LC-LMF
Doc Tracker-SC-SMF
Doc Tracker-TC-TMF