ABCDEFGHIJKLMNOPQRSTUVWXYZAAABACADAEAFAGAHAIAJAKALAMANAOAPAQARASATAUAVAWAXAYAZBABBBCBDBEBFBGBHBIBJBKBLBMBNBOBPBQBRBSBTBUBVBWBXBYBZCACBCCCDCECFCGCHCICJCKCLCMCNCOCPCQCRCSCTCUCV
1
2019 Build ScheduleJanuaryFebruaryMarchApril
2
Note: All colors correspond to subteam/group responsibility. See legend at the bottom of sheet.
Week 1Week 2Week 3Week 4Week 5Week 6Week 7Week 8Week 9Week 10Week 11Week 12Week 13Week 14
3
Enter a start date and number of days. The End date and X will autofill
SS
M
TWThFSSMTWThFSSMTWThFSSMTWThFSSMTWThFSSMTWThFSSMTWThFSSMTWThFSSMTWThFSSMTWThFSSMTWThFSSMTWThFSSMTWThFSSMT
4
Event/TaskDescription
Start Date
End DateDays89101112131415161718192021222324252627282930313233311234567891011121314151617181920212223242526272812345678910111213141516171819202122232425262728293031123456789
5
TS
6
KickoffRAPID REACT1/4/20201/4/20201Bri
7
Aag
8
Week 1 Gvn
9
Rules testing Discuss/decide robot capabilities1/4/20201/4/20201Ali
10
Game BreakdownDecide robot mechanisms1/4/20191/4/20191Nn
11
Regular Subsystem Brainstorm
Prototype mechanisms (drivebase, intake, etc)
1/7/20191/10/20194X
X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXDa
12
Drive Base code BrainStornm build Drive base
1/4/20191/7/20194XX
X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXna
13
Build Season committee Meets1/5/20191/5/20191XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXTdn
14
Vision Code
Vision code to recognize a target. Testing alignment on a drive base
1/9/20191/16/20198X
X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXAd
15
Gs
16
Week 2is
17
Prototyping
Prototype mechanisms (drivebase, intake, etc)
1/9/20191/16/20198XXXXXXXXge
18
Drivebase Programing designDesign chassis (or build from KoP)1/9/20191/14/20196XXXXXXnt
19
Drive base Build
Design bellypan to secure electronics with pocketed sheet metal (optional, could use just wood)
1/13/20191/16/20194XXXXBu
20
Designing intakes, shooters, climbers, etc.
1/16/20191/31/201916XXXXXXXXXXXXXXXXAip
21
Fabricate drivebase parts (if necessary)
Depending on KoP/custom DT1/16/20191/22/20197XXXXXXXGn
22
Build Field Elements
Field elements out of plywood (e.g. airship in 2017, tower in 2016)
1/6/20191/20/201915X
X
XXXXXXXXXXXXX@
23
Vision and Logging Code1/9/20191/16/20198XXXXXXXXA@
24
Mechanism Code
Write and test code for robot mechanisms as hardware is completed
1/17/20192/20/201935XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXNS
25
DGh
26
Week 3ue
27
Drivebase Electrical Assembly
Assembling/Mounting all necessary electronics to bellypan of competition robot
1/20/20191/22/20193XXXTlp
28
Superstructure designDesign intake, shooters, climbers, etc.1/16/20191/31/201916XXXXXXXXXXXXXXXXAlh
29
Superstructure Design Review
Critically analyzing all superstructure designs, making necessary adjustments
1/23/20191/23/20191XGe
30
MECHANISM DESIGN FREEZE
Continue development in current ideas, no sudden switches to different designs
1/20/20191/20/20191XLr
31
Build Field Elements
Field elements out of plywood (e.g. airship in 2017, tower in 2016)
1/6/20191/20/201915X
X
XXXXXXXXXXXXXBad
32
Fabricate drivebase partsDepending on KoP/custom DT1/16/20191/22/20197XXXXXXXAk
33
Fabricate superstructure parts
Have part drawings ready for machinist to fabricate
1/20/20192/10/201922XXXXXXXXXXXXXXXXXXXXXXGe
34
Fabricate bumpers
Part drawings, fabric, pool noodles, etc. ready to go
1/23/20192/6/201915XXXXXXXXXXXXXXX
35
Mechanism Code
Write and test code for robot mechanisms as hardware is completed
1/17/20192/20/201935XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXAX
36
Autonomous Testing with drivebase
Test drivetrain code and begin drivetrain movements for autonomous.
1/24/20192/10/201918XXXXXXXXXXXXXXXXXXN
37
D
38
Week 4
39
Superstructure DesignDesign intake, shooters, climbers, etc.1/16/20191/31/201916XXXXXXXXXXXXXXXXT
40
Superstructure Assembly
Assembling/mounting various mechanisms
1/24/20192/9/201917XXXXXXXXXXXXXXXXXA
41
Superstructure Integration
Mounting/General testing of mechanisms on drivetrain
1/27/20192/9/201914XXXXXXXXXXXXXXG
42
Fabricate superstructure parts
Have part drawings ready for machinist to fabricate
1/20/20192/10/201922XXXXXXXXXXXXXXXXXXXXXX
43
Fabricate bumpers
Part drawings, fabric, pool noodles, etc. ready to go
1/23/20192/6/201915XXXXXXXXXXXXXXX
44
Mechanism Code
Write and test code for robot mechanisms as hardware is completed
1/17/20192/20/201935XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
45
Autonomous Testing with drivebase
Test drivetrain code and begin drivetrain movements for autonomous.
1/24/20192/10/201918XXXXXXXXXXXXXXXXXXB
46
A
47
Week 5 G
48
Superstructure Assembly
Assembling/mounting various mechanisms
1/24/192/9/201917XXXXXXXXXXXXXXXXX
49
Superstructure Integration
Mounting/General testing of mechanisms on drivetrain
1/27/192/9/1914XXXXXXXXXXXXXXA
50
Fabricate bumpers
Part drawings, fabric, pool noodles, etc. ready to go
1/23/20192/6/1915XXXXXXXXXXXXXXXN
51
Fabricate superstructure parts
Have part drawings ready for machinist to fabricate
1/20/192/10/201922XXXXXXXXXXXXXXXXXXXXXXD
52
Fabricate bumpers
Part drawings, fabric, pool noodles, etc. ready to go
1/23/192/6/1915XXXXXXXXXXXXXXX
53
Autonomous testing with drivebases
Test drivetrain code and begin drivetrain movements for autonomous.
1/24/20192/10/201918XXXXXXXXXXXXXXXXXXT
54
Mechanism Code
Write and test code for robot mechanisms as hardware is completed
1/17/20192/20/201935XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXAX
55
G
56
Week 6
57
Robot Complete
Robot is assembled and wired, in Programming possession
2/10/20192/10/20191X
58
Full Robot Testing
Programming and Mechanical work together to simulate matches, support mechanism development
2/10/192/19/201910XXXXXXXXX
59
Driver Practice
Driver/Operator practice controls. Full timed matches are helpful.
2/10/20193/3/201922XXXXXXXXXBXXXXXXXXXXXX
60
b
Paper scouting to write down important data points
2/20/20193/3/201912AXXXXXXXXXXXX
61
Autonomous testing with drivebases
Test drivetrain code and begin drivetrain movements for autonomous.
1/24/20192/10/201918XXXXXXXXXXXXXXXXXXG
62
Mechanism Code
Write and test code for robot mechanisms as hardware is completed
1/17/20192/20/201935XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
63
Full Autonomous Testing
Full testing of autonomous on practice field conditions, with both drivetrain and mechanism code running.
2/9/193/9/201929XXXXXXXXXXAXXXXXXXXXXX
64
Fabricate superstructure parts
Have part drawings ready for machinist to fabricate
1/20/192/10/201922XXXXXXXXXXXXXXXXXXXXXXN
65
Fabricate replacement parts
Predict which parts are going to break, deform, etc. and bring extra to replace at competition
2/10/20193/3/201922XXXXXXXXXDXXXXXXXXXXXX
66
67
Color KeyT
68
StrategyA
69
General subsystemG
70
Drive base
71
Build Season commitee
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100