CPD Critical Point Dryer Tousimis 915B, cpd

The Automegasamdri-915B Critical Point Drying (CPD) tool is used for carbon dioxide (CO2) drying after release of bulk or surface micromachined devices. Critical point drying is an efficient method of drying delicate samples without damaging it's structure by surface tension that occurs when changing from the liquid to the gaseous phase. The release is usually performed by immersion of the device in hydrofluoric acid followed by subsequent immersions in several beakers of DI water. The CPD requires that the device be completely free of acid or water before introducing it to the chamber. To avoid this, the device should be placed in isopropyl alcohol for at least one hour.

Picture and Location

Background

Process Capabilities

Cleanliness Standard

Performance of the Tool

Contact List and How to Become a User

Operating Procedures

General Operating Procedure

Shutdown Procedures:

Helpful Hints:

Picture and Location

CPD

The tool is located at CD45 on the SNF Cleanroom Map.

 

Background

The Automegasamdri-915B Critical Point Drying(CPD) tool is used for the MEMS carbon dioxide (CO2) dry release typically after wet etching. Critical point drying is an efficient method of drying delicate samples without damaging it's structure by surface tension that occurs when changing from the liquid to the gaseous phase. Critical point drying is usually performed release of bulk or surface micromachined devices. This release is usually performed by immersion of the device in hydrofluoric acid followed by subsequent immersions in several beakers of DI water. The CPD requires that the device be completely free of acid or water before introducing it to the chamber. To avoid this, the device should be placed in Isopropyl Alcohol for at least one hour. The CPD achieves a phase change from liquid to dry gas without the effects of surface tension. The critical constants for carbon dioxide are 31.1C and 1070 psi.

 

Process Capabilities

Cleanliness Standard

The Tousimis 915B Critical-Point Dryer system is in the flexible equipment group.

 

Performance of the Tool

 

How to Become a User

Read all material on the SNF website concerning the CPD

 

Operating Procedures

Sample Preparation:

This can be done at the wet benches flexible corrosive.

This can be done at the wet bench flexible solvent.

Never expose chamber to any acids or water!

Don't leave the system while processing!

  1. Contact staff in charge and ask about availability of LCO2 (99.99%).
  2. Enable cpd.
  3. Record LCO2 weight in log sheet. One run uses 3 to 4 pounds of LCO2.
  1. Check valves:
  1. “Main Power Breaker” is always on (right side of machine).
  2. “Chiller Power” press ON, wait for 30 minutes.
  3. Press “Condenser Power” ON.
  4. Press “Chamber Power” ON (VENT light on), wait for 3 – 5minutes.
  5. Remove chamber lid and place it on aluminum foil or stack of thin clean room wipes.
  6. Check inside of chamber lid, o-ring, inserts, and baskets for particles. Rinse off particles using IPA at the solvent bench, wbflexsolv, or use IPA on a thin cleanroom wipe!
  7. Check o-ring, if the o-ring is flat, shutdown the system and contact maintenance.
  8. Place inserts or basket in chamber.
  9. Press VENT (VENT light will blink).
  10. Fill sufficient Isopropanol (Methanol or Acetone are not allowed) in chamber to cover your wafers.
  11. Transfer wafer or die directly from beaker (filled up with IPA) in chamber.
  12. Lower chamber lid onto chamber and use fingers to evenly tighten the 8 nuts.
  13. Tighten 8 nuts in numbered sequence using the wrench and repeat until nuts are unable to tighten further. Don't overdue it!
  14. Set PURGE time (15 minutes is max!)
  15. Press COOL (VENT light goes off, COOL light goes on), Temperature drops to 10°C within 4 minutes.
  16. Once Temperature reaches 10°C press FILL (COOL light off, FILL light on). Noice, hissing sound! Pressure goes up to 800 to 900 psi.
  1. Open chamber at 0 psi and loosen 8 nuts in reverse pattern (8,7…1).
  2. Remove wafer, wafer should be dry, if not, contact SNF staff.

 

Shutdown Procedures:

  1. Clean chamber, lid, inserts, and basket with IPA and blow dry.
  2. Place lid back on chamber, don’t tighten nuts.
  3. Press “Chiller Power” OFF
  4. Press “Condenser Power” OFF
  5. Press “ Chamber Power” OFF
  6. Fill out log sheet.
  7. Disable cpd.

 

Helpful Hints: