Student's use of time coding form

 

Teacher:               Patrick Wingler                                                                      Class:                             MWF 11:30                                         

Topic:                             Broomball                                                                                    Grade:                                                                                    

Date:                             10/28/09                                                                                    # of Students:                             22                                         

Time analysis codes: Decision is based on what 51% of the observed students are doing at the time.

 

M = Management

Time when most students (over 50%) are not receiving instruction or involved in lesson activity (e.g., changing activities, getting out or putting away equipment, listening to behavior rules or reminder).

A = Activity

Time when most students (over 50%) are involved in physical movement (e.g., catching a ball, throwing at a target, running).

I - Instruction

Time when most students (over 50%) are receiving information about how to move or perform a skill (e.g., how to move using all the space, watching a demonstration, listening to instructions).

W = Waiting

Time when most students (over 50%) are not involved in the other categories (e.g., group activity but only one or two are participating, waiting for a turn, off-task behavior, waiting for the teacher to give directions).

 

                                   1                               2                                3                                4                              5                               6                                      

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

I

I

I

I

I

I

I

I

I

M

A

A

A

A

A

I

I

a

A

A

A

A

A

A

A

A

A

I

I

I

I

I

I

I

I

I

 

                                   7                                8                               9                                10                            11                             12                                      

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

M

A

A

A

A

A

A

A

A

A

A

A

A

A

I

I

I

I

I

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

                                    13                             14                             15                              16                             17                             18                                      

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Percent of M time =                             20                                             ÷                               550                                             =               3                %      

              TOTAL M seconds               TOTAL LESSON seconds

 

Percent of A time =                             280                                              ÷                                550                                             =               52                %      

              TOTAL A seconds               TOTAL LESSON seconds

 

Percent of I time =                             250                                              ÷                                550                                             =               45                %      

              TOTAL I seconds               TOTAL LESSON seconds

 

Percent of W time =                             0                                              ÷                                550                                             =               0                %      

              TOTAL W seconds               TOTAL LESSON seconds

 

Grade:

Management < 15% = 1 pt.

Activity > 50% = 2 pts.

Instruction < 30% = 1 pt.

Waiting < 5% = 1 pt.                                                                                                   Total Score (M+A+I+W)=               4