PROJECT TITLE / LOCATION /MUNICIPALITY

ACCOMPLISHMENT

LENGTH (M)

WIDTH (M)

SAN ANTONIO:



ROADS




1

BaƱaga St. Santiago

200.20

4.00

2

Delos Reyes St., San Juan

13.05

5.00

3

East Dirita Brgy. Road

801.41

4.00

4

Evangelista St., Burgos

220.40

5.00

5

F. Conception, Burgos

121.60

4.10

6

Guerrero St., San Juan

200.10

4.00

7

Jacinto St., Burgos

519.20

5.00

8

Jacinto St., Luna

115.00

5.00


9

LaPaz St.

33.00

4.00

10

Lipit Road, Brgy. Burgos

1,309.50

5.00

11

Madarang St.

363.62

5.00

12

Magsaysay St., San Nicolas

127.50

5.00

13

Mendoza St., San Juan

122.80

4.00

14

Pascasio St., San Nicolas

72.10

4.70

15

Pundakit Brgy. Road

2,124.90

4.00

16

Purok I, West Dirita

180.00

5.00

17

R.Conception St., San Nicolas

175.00

5.00

18

San Antonio-Angeles Road

500.00

5.00

19

San Gabriel St., San Nicolas

412.00

4.00

20

San Jose St., Luna

264.50

5.00

21

San Miguel

1,229.94

6.00


22

San Rafael Brgy. Road

528.35

6.10


23

Various Road 1

1,454.71

4.00


24

Various Road 2 (Guerero, Mendoza, Conception, et al)

2,020.00

5.00


25

Various Roads 3 (Luna, Burgos, San Gregorio, Santiago)

3,004.00

5.00


26

Asphalting of Burgos & San Nicolas Brgy. Road, San Antonio




27

Completion of Various Roads (F. Magsaysay, Mendoza, E. delos Reyes, R. Concepcion, I. Madarang Sts.), San Antonio




28

Asphalting of Luna, San Gregorio and Santiago Brgy. Roads, San Antonio



29

Improvement of San Antonio-Angeles-Nagbayan-Castilejos Rd


30

Asphalting of Perimeter Parking Area at San Antonio Public Market, San Antonio



31

Improvement of San Antonio-Poblacion Road, San Antonio




OTHER PUBLIC INFRASTRUCTURE:




32

Provision/Installation of 2-Lines 1.20 m dia.




33

RCPC including the Construction of Stone




34

Masonry Headwall, San Antonio-Angeles Road



35

Construction of Twenty Six Classroom Two Storey H/S Bldg., San Gregorio E/S., San Antonio