PROJECT TITLE/LOCATION |
ACCOMPLISHMENT |
||
|
|
|
LENGTH (M) |
WIDTH (M) |
||
|
|
CASTILLEJOS: |
|
|
||
|
|
ROADS |
|
|
|
|
|
|
1 |
Alusiis Brgy. Road |
745.30 |
4.00 |
|
|
|
2 |
Balaybay Brgy. Road |
982.01 |
4.00 |
|
|
|
3 |
Cacho & Mangosing Sts. |
568.00 |
4.50 |
|
|
|
4 |
Castillejos Airport Road |
812.00 |
6.00 |
|
|
|
5 |
Cemetery Access |
550.00 |
4.00 |
|
|
|
6 |
JV St. |
183.00 |
4.00 |
|
|
|
7 |
Magsaysay Brgy. Road |
223.00 |
5.00 |
|
|
|
8 |
Nagbayan Road, Phase I & II |
2,519.60 |
5.00 |
|
|
|
9 |
Nagbunga-Buenavista Road |
2,041.30 |
5.00 |
|
|
|
10 |
Pag-asa St., Brgy. Del Pilar |
276.60 |
5.00 |
|
|
|
11 |
San Agustin-Looc, Phase I,II,III,IV |
5,968.00 |
5.00 |
|
|
|
12 |
San Diego St., San Jose |
102.20 |
3.70 |
|
|
|
13 |
San Pablo Brgy.Road, Phase I&II |
1,094.50 |
5.00 |
|
|
|
14 |
San Pablo-San Isidro |
1,040.00 |
6.00 |
|
|
|
15 |
San Roque St. |
256.55 |
4.00 |
|
|
|
16 |
Sta. Maria & San Jose Roads |
1,507.00 |
4.50 |
|
|
|
17 |
Asphalting of San Agustin-Castillejos Provincial Road, Castillejos |
|
|
|
|
|
18 |
Asphaltingof Castillejos Airport Road including Wawandue Brgy. Road, Subic |
|
|
|
|
|
19 |
Construction of GoVic By-pass Road (del Pilar- Magsaysay Road) Phase 2, Castillejos |
|
|
|
|
|
20 |
Asphalting of Perimeter Parking Area (Front & Side) at Castillejos Public Market |
|
|
|
|
|
21 |
Improvement of Old San Agustin Road, Castillejos |
|
|
|
|
|
22 |
Upgrading of Old San Agustin Brgy. Road, Castillejos, Zambales |
|
|
|
|
|
23 |
Construction of Villaflor-San Nicolas Brgy. Road Castillejos, Phase 1 |
|
|
|
|
|
24 |
Construction of Cawag - Balaybay Road Subic & Castillejos, Zambales (Segment 1,2,3 & 4) |
|
|
|
|
|
|
|
|
|
|
|
|
OTHER PUBLIC INFRASTRUCTURE: |
|
|
||
|
|
25 |
Construction of Twenty Six Classroom Two Storey H/S Bldg., Villaflor, Castillejos |
|
||
|
|
26 |
Improvement of Gabaldon Type School Bldg, Castillejos Central School |
|
|
|
|
|
27 |
Const. of Two (2) Units, Three CL. BOD Type S/B Villaflor E/S., Castillejos |
|
|
|
|
|
28 |
Const. of Line Canal incl. Concreting of Driveways at Magsaysay, Cast. |
|
||
|
|
29 |
Installation of Two Lines, 2.0 m RCPC including the provision of |
|
|
|
|
|
|
Stone Masonry Headwall, Magsaysay, Castillejos |
|
|
|
|
|
30 |
Restoration Works at Castillejos Public Market |
|
|
|
|
|
|
due to the Damaged occurred during the Demo- |
|
|
|
|
|
|
lition of conc. Elevated Water Tank, Castillejos |
|
|
|
|
|
31 |
Installation of 5-Lines and 1-Line, 2.0 m dia. |
|
|
|
|
|
|
RCPC including the Const. of Stone Masonry |
|
|
|
|
|
|
Headwall & R.C. Apron, Phase 1, Castillejos |
|
|
|
|
|
32 |
Installation of 5-Lines and 1-Line, 2.0 m dia. |
|
|
|
|
|
|
RCPC including the Const. of Stone Masonry |
|
|
|
|
|
|
Headwall & R.C. Apron, Phase 2, Castillejos |
|
|
|
|
|
33 |
Installation of 2-Lines, 1.2 m dia. & 1-Line |
|
|
|
|
|
|
0.90 m dia. RCPC including Construction of |
|
|
|
|
|
|
Stone masonry Headwall, San Isidro, Castillejos |
|
|
|
|
|
34 |
Repair Works at CHB Wall Partitions at |
|
|
|
|
|
|
Don Jesus Magsaysay H/S, Villaflor, Castillejos |
|
|
|
|
|
|
Zambales |
|
|
|
|
|
35 |
Improvement of 4-Lines, 1.2 m dia. RCPC and |
|
|
|
|
|
|
Provision of Stone Masonry Headwall, Buena- |
|
|
|
|
|
|
vista, Castillejos |
|
|
|
|
|
36 |
Painting thermoplastic pavement markings of |
|
|
|
|
|
|
Castillejos by pass road and Villaflor San Nico |
|
|
|
|
|
|
las Barangay Road, Castillejos, Zambales |
|
|
|
|
|
37 |
Construction of four (4) Units Row Houses, Balaybay-Cawag Road, Castilljeos, Zambales |
|
|
|
|
|
38 |
Painting thermoplastic pavement markings of San Antonio -Angeles-Nagbayan Castillejos Prov'l. Road and San Nicolas Balaybay Road, San Antonio & Castillejos. |
|
|
|
|
|
39 |
Construction of New Castillejos Public Market Building 1 and 2, Phase I and II, Castillejos |
|
||
|
|
40 |
Constrution of GOVIC Day's Market Bldg. Castillejos Public Market, Castillejos. |
|
|
|
|
|
41 |
Cavite Communal Irrigation System |
|
|
|
|
|
|
(Installation of 40.00 ln.m sheet piles) |
|
|
|
|
|
|
Nagbayan, Castillejos. |
|
|
|
|
|
42 |
Slope protection of Nagbayan-Angeles |
|
|
|
|
|
|
Road including clearing & desilting of River |
|
|
|
|
|
|
Channel, Castillejos, Zambales. |
|
|
|
|
|
43 |
Dredging of Alinap Creek, Phase 2, |
|
|
|
|
|
|
Sitio Alinap, Balaybay, Castillejos. |
|
|
|
|
|
44 |
Desilting of Alinap River and Demolition of |
|
|
|
|
|
|
existing two-barrel RCBC, Alinap, |
|
|
|
|
|
|
Balaybay, Castillejos. |
|
|
|
|
|
45 |
Re-cost. Of Multi-purpose Gymnasium, Villaflor H/S |
|
|
|