PROJECT TITLE/LOCATION |
ACCOMPLISHMENT |
||
|
|
|
LENGTH (M) |
WIDTH (M) |
||
|
|
BOTOLAN: |
|
|
||
|
|
ROADS |
|
|
|
|
|
|
1 |
Bangan Brgy. Road |
1,002.38 |
6.00 |
|
|
|
2 |
Bangan-Capayawan |
|
|
|
|
|
3 |
Beneg Brgy. Road |
482.15 |
4.80 |
|
|
|
4 |
Botolan-Mambog Road |
1,382.93 |
5.00 |
|
|
|
5 |
Danacbunga Brgy. Road |
1,056.75 |
6.00 |
|
|
|
6 |
Iba-Tarlac Road, Package I, Phase V |
1,480.00 |
12.00 |
|
|
|
7 |
Loobbunga Brgy. Road (Interfaith Vill.) |
780.00 |
6.00 |
|
|
|
8 |
Loobbunga Resettlement Road Network |
701.20 |
5.00 |
|
|
|
9 |
Mambog-Taugtog-Paitan |
1,171.30 |
5.00 |
|
|
|
10 |
Olongapo-Bugallon Road, Bucao Section |
267.95 |
6.10 |
|
|
|
11 |
Quinarean Brgy. Road |
627.48 |
4.00 |
|
|
|
12 |
Tampo Brgy. Road |
1,120.94 |
5.00 |
|
|
|
13 |
Various Roads, Botolan 1 |
|
|
|
|
|
|
-A. Dollete St. |
203.30 |
6.00 |
|
|
|
|
-Balda St. |
205.15 |
6.00 |
|
|
|
|
-Basa St. |
213.85 |
6.00 |
|
|
|
|
-Cementery Access Road, Paco |
68.45 |
6.00 |
|
|
|
|
-Lesaca St. |
195.13 |
6.00 |
|
|
|
14 |
Various Roads 2 |
2,070.19 |
5.00 |
|
|
|
15 |
Asphalting of Santiago-Mambog Brgy. Roads including the Repair of Botolan-Mambog Provincial Road |
|
|
|
|
|
16 |
Construction of Panan Brgy. Road, Botolan |
|
|
|
|
|
17 |
Asphalting of Taugtog Resettlement Road Network including Paco Brgy. Road at botolan, Repair of Iba-Sta. Barbara Road and Kinabuangan-collat Road, Masinloc |
|
||
|
|
18 |
Improvement of Loobbunga Brgy. Road, Botolan |
|
|
|
|
|
OTHER PUBLIC INFRASTRUCTURE: |
|
|
||
|
|
19 |
Restoration of Sideslopes of Loobunga Bridge including concreting of Roadway, Botolan - |
|
|
|
|
|
20 |
Construction of Drainage & Erosion Control Structures at Loobbunga Brgy Road, Botolan |
|
|
|
|
|
21 |
Redecking of Loobbunga Bailey Bridge (Replace ment of Wooden S/S to Struct'l Steel S/S)Bot |
|
|
|
|
|
22 |
Installation of 1-Line, 2.0mdia. RCPC & Construction of Masonry Headwall including replacement of Concrete Pavement, Loob-Bunga, Botolan |
|
|
|