SAMPLE

PROJECT PLAN



































PROJECT PLAN TEMPLATE

< INSERT ISSUING ORGANIZATION >

< INSERT PROJECT NAME >

Document Revision #:

Date of Issue:

Project Manager:

Approval Signatures





Approved by: Business Project Leader


Approved by: IM/IT Project Leader










Prepared by: Business Project Manager


Prepared by: IM/IT Project Manager












Reviewed by: Quality Assurance Manager




Table of Contents

1. Project Overview 1

1.1 Purpose, Scope, and Objectives 1

1.2 Assumptions, Constraints and Risks 1

1.3 Project Deliverables 2

1.4 Schedule and Budget Summary 2

1.5 Evolution of the Plan 2

1.6 References 2

1.7 Definitions and Acronyms 3

2. Project Organization 4

2.1 External Interfaces 4

2.2 Internal Structure 4

2.3 Roles and Responsibilities 4

3. Managerial Process Plans 5

3.1 Start up Plan 5

3.1.1 Estimates 5

3.1.2 Staffing 5

3.1.3 Resource Acquisition 5

3.1.4 Project Staff Training 6

3.2 Work Plan 6

3.2.1 Work Breakdown Structure 6

3.2.2 Schedule Allocation 6

3.2.3 Resource Allocation 7

3.2.4 Budget Allocation 7

3.3 Project Tracking Plan 8

3.3.1 Requirements Management 8

3.3.2 Schedule Control 8

3.3.3 Budget Control 8

3.3.4 Quality Control 9

3.3.5 Reporting 9

3.3.6 Project Metrics 9

3.4 Risk Management Plan 9

3.5 Project Closeout Plan 10

4. Technical Process Plans 11

4.1 Process Model 11

4.2 Methods, Tools, and Techniques 11

4.3 Infrastructure 11

4.4 Product Acceptance 11

5. Supporting Process Plans 13

5.1 Configuration Management 13

5.2 Verification and Validation 13

5.3 Documentation 13

5.4 Quality Assurance 14

5.5 Reviews and Audits 14

5.6 Problem Resolution 14

5.7 Subcontractor Management 15

5.8 Process Improvement 15

6. Additional Plans 16

7. Project Evolution 17

7.1 Project support and maintenance 17

7.2 Follow-up projects 17

Annex A 18

Annex B 19



Document Change Control

This section provides control for the development and distribution of revisions to the Project Charter up to the point of approval. The Project Charter does not change throughout the project life cycle, but rather is developed at the beginning of the project (immediately following project initiation approval, and in the earliest stages of project planning). The Project Charter provides an ongoing reference for all project stakeholders. The table below includes the revision number (defined within your Documentation Plan Outline), the date of update/issue, the author responsible for the changes, and a brief description of the context and/or scope of the changes in that revision.

Revision Number

Date of Issue

Author(s)

Brief Description of Change





1.Project Overview

This section of the IM/IT Project Management Plan provides an overview of the purpose, scope and objectives of the project for which the Plan has been written, the project assumptions and constraints, a list of project deliverables, a summary of the project schedule and budget, and the plan for evolving the IM/IT Project Management Plan.

1.1Purpose, Scope, and Objectives

1.2Assumptions, Constraints and Risks

1.3Project Deliverables

1.4Schedule and Budget Summary

1.5Evolution of the Plan

The structure of this Project Plan is in compliance with the recommendations of IEEE Std 1058 1998.

1.6References

1.7Definitions and Acronyms





2.Project Organization

2.1External Interfaces

2.2Internal Structure

2.3Roles and Responsibilities





3.Managerial Process Plans

This section of the IM/IT Project Management Plan specifies the project management processes for the project. This section defines the plans for project start up, risk management, project work, project tracking and project close out.

3.1Start up Plan

3.1.1Estimates

3.1.2Staffing

3.1.3Resource Acquisition

3.1.4Project Staff Training

3.2Work Plan

3.2.1Work Breakdown Structure

3.2.2Schedule Allocation

3.2.3Resource Allocation

3.2.4Budget Allocation

3.3Project Tracking Plan

3.3.1Requirements Management

3.3.2Schedule Control

3.3.3Budget Control

3.3.4Quality Control

3.3.5Reporting

3.3.6Project Metrics

3.4Risk Management Plan

3.5Project Closeout Plan

4.Technical Process Plans

4.1Process Model

4.2Methods, Tools, and Techniques

4.3Infrastructure

4.4Product Acceptance

5.Supporting Process Plans

5.1Configuration Management

5.2Verification and Validation

5.3Documentation

5.4Quality Assurance

5.5Reviews and Audits

5.6Problem Resolution

5.7Subcontractor Management

5.8Process Improvement

6.Additional Plans

7.Project Evolution

7.1Project support and maintenance

7.2Follow-up projects





Annex A
Annex B